Products / Slides & faders
Products / Slides & motor faders

Slide potentiometers and
motorized faders

Compare SVR01 manual slides with MSV02 and MSV05 motor faders. Select travel, taper, lever and connection for your control design.

COOKA / PRECISION IN MOTION
Cooka MSV05 product
Available series information

Compare starting formats.

Selection guide

Choose a slide potentiometer or motor fader

Choose a manual slide potentiometer when the operator moves the lever. Choose a motor fader when the design also needs motor-actuated positioning. Cooka offers SVR01 manual formats and MSV02 / MSV05 motor faders, with travel, taper, lever and connector choices defined by the order code.

Swipe or scroll to compare all columns.

Manual slide and motor fader comparison
SeriesActuationTravel / resistanceLinearityNo-load life
SVR01Manual45 / 60 / 100 mm
5 / 10 kΩ
±3% maximum1 million cycles
reference configuration
MSV02Motor-actuated60 / 100 mm
5 / 10 kΩ
±2.5% reference;
±1% / ±1.5% options
1 million cycles
MSV05Motor-actuated60 / 100 mm
5 / 10 kΩ
±2% maximum2 million cycles
blank life code; L: 1 million

Values follow the published series specifications or technical summary. SVR01 has additional life-code options. Confirm the lever, curve, track, connector and life code for the ordered configuration.

Match the travel and electrical response

Check the required lever movement, panel clearance, linear or audio taper and single or duplex track. SVR01 offers light or heavy slide-feel options. MSV05 has T, TL and TA lever constructions, with FFC-1.0-10P or PH-7P connector choices according to the order code.

Review the motor and wiring together

For a motor fader, send the intended driver, control method, supply and connector requirements with your drawing. Confirm the motor voltage, current and pinout for the selected configuration before wiring. The potentiometer element input rating is separate from the motor supply rating.

Ordering slide potentiometers

Can I request a sample or STEP model?

Free samples are available for qualified projects, and STEP models are provided after a project enquiry. Include the travel, lever, connector and expected quantity.

What are the MOQ and lead time?

Standard configurations start at 10 pcs. In-stock configurations ship in 3–7 days; custom configurations and schedules are reviewed per project.

Series & component directory

Find your reference.

Select a model for product information or a model-specific document enquiry.

Configuration review

Define the interface
before the part number.

  • Manual or motor-actuated
  • Travel and lever geometry
  • Track, taper and connector
Discuss This Product Family

Tell us what your design needs.

Send a model, drawing or application to start a technical conversation.

Request a Quote
MORE SLIDE SERIES

More models to compare.

Request a Quote